Skip to product information
1 of 8

SPACELION

SPACE LION Dog Puffer Jacket, Down Winter Coat, Durable Outdoor Coat for Cold and Windy Conditions, Lightweight & Adjustable Fit Coats for Large Dogs,(Khaki, Size28/4XL)

SPACE LION Dog Puffer Jacket, Down Winter Coat, Durable Outdoor Coat for Cold and Windy Conditions, Lightweight & Adjustable Fit Coats for Large Dogs,(Khaki, Size28/4XL)

Regular price $107.23 USD
Regular price Sale price $107.23 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • 【INCLUSIVE SIZE RANGE】Back length includes: 8", 10", 12", 14", 16", 18", 20", 22", 24", 26", 28", 30". This dog down jacket offers a complete size selection ensures every dog finds its perfect fit. It accommodates most breeds, including popular large breeds such as Australian Shepherd, Labrador, Golden Retriever, German Shepherd, and Boxer. For accuracy, we recommend measuring your puppy's size and referring to the size chart to ensure the most comfortable fit.
  • 【ADAPTIVE CHEST FIT】A stretch-friendly chest panel flexes to fit broader or slimmer builds comfortably, giving both compact pups and deep-chested adventurers a secure, easy-wearing fit. It moves with the body for natural play, long walks, and cold-weather outings without restriction.
  • 【WARMTH THAT TRULY PERFORMS】Filled with premium natural duck down—tested and certified for thermal performance by SGS—locks in dependable warmth without the heavy bulk. It features a 5-layer structure, filled with high-density fabric. Lightweight, water-repellent, and windproof, this dog winter coat provides all-around protection. Whether heading out for daily walks or tackling winter trails, this insulation keeps your puppy cozy, comfortable, and ready to explore the world with you.
  • 【NECK & TAIL ADJUSTABILITY】A durable Velcro Collar at the neck creates a flexible fit for thick or slender necks. The adjustable drawstring at the tail helps shorten or extend the back length as needed. This dog winter jacket providing customized comfort and ensuring centered coverage.
  • 【EASY CARE METHOD】Simply tumble dry on a no-heat setting to restore the down’s loft and softness. The down jacket refreshes easily, staying fluffy, warm, and ready for winter adventures day after day.

Overview

  • Size : 28/Large Dogs
  • Neck Size : 25.5 inches
  • Chest Size : 40 Inches
  • Occasion : casual, outdoor
  • Special Feature : Leash Hole, Lightweight, Weather Resistant
View full details